Project Details

Owner:
City of Saskatoon
Location:
Saskatoon, SK
Project Delivery Method:
Design-Bid-Build
Architect:
aodbt architecture + interior design
Building size:
9,848 SF
Disciplines:
Mechanical
Discipline Leads:

Project Summary

CITY OF SASKATOON FIRE HALL NO. 3 RELOCATION

After completing an efficiency review of its operations and community impact, the Saskatoon Fire Department developed a new service model that will involve moving Fire Station No. 3 from Taylor Street and York Avenue to 2613 Clarence Avenue South within an established neighborhood.

The new fire hall provides services for the area and will improve response times, including those to Saskatoon’s new Stonebridge development.

Mechanical systems design includes a high-efficiency boiler system, variable refrigerant cooling and heating system, in floor and overhead radiant heating.

The majority of systems are to be controlled via packaged controllers with interfaces via BacNet to a central Building Control System. This allows for a system that has maintainability in mind with keeping custom building control algorithms to a minimum.

 

.