Project Details

Owner:
Procura
Location:
Edmonton, AB
Project Delivery Method:
Design-Bid-Build
Architect:
Humphrey’s and Partners Architects
Contractor:
ITC
Construction Value:
$53 Million
Timeline:
2013 - 2016
Disciplines:
Mechanical
Electrical
Discipline Leads:

Project Summary

MAYFAIR ON JASPER

The Mayfair on Jasper project demonstrates the ability of Arrow’s Mechanical and Electrical groups to work toward the delivery of integrated engineering services in support of a large, long-term, phased projects.

Mayfair North was designed in response to Downtown Edmonton’s increasing demand for centralized multi-family living, with close proximity to amenities and downtown office space. Mayfair North provides residents with heated underground parking, a fitness facility and a green roof, all located on the intersection of Jasper Avenue and 109th Street, one of Edmonton’s busiest and most prominent intersections.

Arrow worked in collaboration with the team from Humphrey’s and Partners Architects, along with developer Procura to deliver the design of 10-storeys of residential space, totaling 237 units of one and two-bedroom suites. Mayfair North contains underground parking with space designated for a premium car sharing program, main floor commercial retail space, and an additional level of above-ground parking.

Mayfair North is one of the first residential buildings in Edmonton to offer a cogeneration system, which repurposes  wasted heat into usable energy; Arrow’s Mechanical and Electrical teams played a significant role in the design of the cogen system and photovoltaic array of solar panels. The intent of this innovation was to build a project which adhered to principles of green design, in addition to the reduction of operating costs.

Mayfair on Jasper was awarded a CEA Award of Excellence for “Building Engineering – Commercial.”