Arrow’s Mechanical team worked to provide design requirements for NAIT’s above-ground parking structure, working in collaboration with Architecture | Tkalcic Bengert. Given NAIT’s steadily increasing parking requirements and limited space, an above-ground parking structure was identified as a solution to alleviate parking requirements for NAIT’s student population.
Design requirements included the demolition of an existing building with relocation of existing utility services; additionally Arrow’s Mechanical team worked to design the new 987 stall, open-air parkade with five levels of parking space, and a below-grade storage area complete with a storm drainage system, irrigation piping distribution to hose bibbs on the main floor, fire protection standpipe system, stairwell and storage room ventilation systems. Additionally, design work for a generator room design c/w cooling and ventilation system was completed.
In January 2024, Arrow Engineering transitioned to operating as Englobe. We are committed to ensuring this transition is as smooth as possible for you and will ensure that key content and contact information is available to every visitor.
To learn more about our service offerings, continue your visit on this website.
To learn more about Englobe’s suite of services and career opportunities, visit Englobe’s website.