Project Details

Owner:
Sobeys Canada
Location:
Sherwood Park, AB
Project Delivery Method:
Design-Bid-Build
Architect:
Kasian Architecture
Timeline:
April 2016 – In Progress
Building size:
65,000 SF
Disciplines:
Mechanical
Electrical
Structural
Discipline Leads:

Project Summary

SOBEYS CONVERSION

Sobeys Sherwood Park is currently under design and is located within the old Target location in Sherwood Park Mall. Delivered working alongside the Kasian team, this design bid build is slotted for completion in March 2017; currently, it’s anticipated that this project will exceed this timeline.

In 2015, Sobey’s head office moved to Calgary as a result of changes in ownership and shipping associated with Sobeys’ purchase of Safeway. As a result of this, much of the knowledge base surrounding the design of new Sobeys’ locations was lost as employees’ changes positions. This has proven to be a challenge for our design team, as they’ve had to work closely with Sobeys to ensure that prototypical designs are understood and enforced throughout new design. This design process has required an incredibly collaborative approach to design – something the Arrow team is well known for.

Arrow’s Mechanical, Electrical and Structural teams are hard at work navigating the requirements of Sobeys prototypical designs, while working with a new ownership group. The Sobeys Sherwood Park location contains all the trappings of a standard Sobeys location, including administration offices, warehouse and receiving space, front-of-house equipment and display shelving in the store area, along with a deli, bakery and a juice bar.